Stadium - Bleacher Rpr, Track/Field Install, Seal, Vip Booth

Project Description

Building - Stadium
Project Name - East Bleacher Rpr, Seal, Track/Field Install, Vip Booth, Backflow Preventor 
Project Manager - Bill Kerbusch bkerbusc@bw.edu, Mark Boyette mboyette@bw.edu, Ron Bokan rbokan@bw.edu, Ed Murray emurray@bw.edu, Larry Leach lleach@bw.edu
Office Phone - 826-2235, 826-8150, 826-8186, 826-8145, 826-6977

Duration - 6/2 through T.B.A.

Description - The east side bleachers will be repaired and sealed, Plaze will be resealed. VIP booth built. Backflow Preventors will be installed. New track and field installed. For your safety, please do not enter any areas that are taped off. Please use caution while in the area during this repair process.